Skip to content

Pipeline Cleaning & Descaling

Pipeline Cleaning & Descaling in Warri.

Pipeline Cleaning & Descaling in Warri, Delta, delivered by NewHouse Energies with owned equipment, written procedures, and a published safety record. Online and offline cleaning with specialised scrapers that pulverise hard deposits without stopping flow. Teams mobilise to Warri and the surrounding Delta for onshore, offshore, and facility scopes — the same engineers, the same standard, wherever the work is.

On the ground

Delta State is where much of our record was written — Escravos, Kwale, Heley Creek, Igbolo, and the Warri refinery itself. From 48-kilometre pigging campaigns to HWU well re-entries and water re-injection at sustained 5 bbl/min per pump, Warri-area operators have seen our crews at their most tested. Mobilisation into Delta's land and swamp terrain is routine for us: owned equipment, written procedures, and the same toolbox-talk discipline whether the client is an IOC, an indigenous producer, or the refinery gate.

The Warri axis — Escravos, Forcados, and the refinery complex — mixes onshore, swamp, and near-shore work in a single operating area, and few campaigns here are simple pumping jobs. Our Delta scopes have run the full sequence: flooding, cleaning, gauging, hydrotesting, dewatering, and drying a line before product, then intelligent pigging to prove its integrity years later. The owned fleet that makes that possible — triplex and centrifugal pumps, HWU support, nitrogen and coil-tubing spreads — is the same discipline we bring to power and solar for Delta's facilities and estates. For operators weighing contractors, the Warri record is not a claim but a list of named projects you can check.

What's included

  • Progressive cleaning trains
  • Hard-deposit scraping
  • Online (live) cleaning
  • Debris capture & disposal
  • ILI-readiness verification

Work in the area

Completed · 2022

30" × 48km Pipeline Cleaning & Intelligent Pigging

Chevron Nigeria Limited — Escravos Tank Farm

Read the full scope
Completed · 2025

Water Re-Injection — DDP Kwale

Mid Western / DDP Kwale — Umusadege 1

Read the full scope
On-going

Well Re-Entry Support — Heley Creek

Platform Petroleum — Heley Creek

Read the full scope
On-going

HWU Well Re-Entry Services — Igbolo-1

Schultz Energy — Igbolo-1, Etua

Read the full scope

Register Your Interest

Begin the Conversation.

Tell us about your project — a pipeline campaign, a facility going solar, a well awaiting re-entry. Share your details and an engineer, not a salesperson, will be in touch within one working day.

Prefer to talk? Tap the WhatsApp button — same engineers, same day.